⚡
ElectricityBillCalc.com
⚠️

Rates on this page are under review and may differ from the state page; verify against your bill.

Tamil Nadu • India ✓ Updated for FY2026-27 Cycle: Bi-Monthly Order: G.O. (Ms) No. 50 dated 10 May 2026 / TNERC Order No. 5 of 2026 (date not yet confirmed), per published reports; primary documents not yet reviewed

TNPDCL Bill Calculator 2026 (Updated: 200 Free Units Scheme)

Distribution utility: Tamil Nadu Power Distribution Corporation Limited (TNPDCL, formerly TANGEDCO/TNEB)
⚡ Direct Answer • How TNPDCL (formerly TANGEDCO/TNEB) Bill is Calculated

To calculate your TNPDCL (formerly TANGEDCO/TNEB) electricity bill in Tamil Nadu on a bi-monthly (60-day) cycle: under the Tamil Nadu Government Order effective 10 May 2026 (per published reports; primary documents not yet reviewed; G.O. (Ms) No. 50 dated 10 May 2026, TNERC Order No. 5 of 2026 (date not yet confirmed)), domestic consumers (LT-1A) using ≤500 units receive 200 free units (saving ₹235). Intermediate usage (201–500 units) is billed at ₹4.70 to ₹6.30/unit. If usage exceeds 500 units, the subsidy reverts to 100 free units, and units 101–200 are charged at ₹2.35/unit up to ₹11.55/unit. Residential meters are exempt from fixed demand charges and electricity duty.

Formula: Net Bill = (Tiered Energy Slabs) + (Fixed Load Fee) + (Duty & FAC) – (State Subsidy) View full Tamil Nadu state guide →
📅 Reflects the Tamil Nadu Government's 200 free units scheme effective 10 May 2026 (per published reports; primary documents not yet reviewed; G.O. (Ms) No. 50 dated 10 May 2026, TNERC Order No. 5 of 2026 (date not yet confirmed)) for consumers using ≤500 units per bi-monthly cycle.

Regulatory Transparency Note: Slab rates for the 201–500 unit range under the new scheme are based on the May 2026 Government Order (G.O. (Ms) No. 50 dated 10 May 2026 / TNERC Order No. 5 of 2026 (date not yet confirmed), per published reports; primary documents not yet reviewed); TNERC/TNPDCL has not yet published a separate gazetted tariff schedule for this band. This calculator will be updated the moment the gazetted notification is issued.

India • Tamil Nadu Cycle: Bi-Monthly

TNPDCL (formerly TANGEDCO/TNEB) Power Bill Calculator

Regulatory Standard: G.O. (Ms) No. 50 dated 10 May 2026 / TNERC Order No. 5 of 2026 (date not yet confirmed), per published reports; primary documents not yet reviewed
Bi-Monthly Period
Units (kWh)
Quick Slabs:
kW
Government Subsidy Scheme: 200 free units per bi-monthly cycle for households consuming ≤500 units under TN Govt Order (effective 10 May 2026, per published reports; primary documents not yet reviewed; G.O. (Ms) No. 50 dated 10 May 2026 / TNERC Order No. 5 of 2026 (date not yet confirmed)); 100 free units for consumption exceeding 500 units.
Total Estimated Bill
₹0
Effective Avg Rate: ₹0.00 / unit

Final bill is rounded to the nearest rupee for display. Line items may not sum exactly due to rounding.

Energy Charges: ₹0.00
Fixed Demand Charges: ₹0.00
Fuel Surcharge (FAC / FPPPA): ₹0.00
Pension & Gratuity (P&G) surcharge: ₹0.00
FY25 True-Up Recovery: ₹0.00
State Electricity Duty: ₹0.00
Govt Subsidy Rebate: - ₹0.00
Active Slab Breakdown:

Current Tariff Slabs & Per-Unit Rates (TNPDCL (formerly TANGEDCO/TNEB))

Tariff rates modeled under G.O. (Ms) No. 50 dated 10 May 2026 / TNERC Order No. 5 of 2026 (date not yet confirmed), per published reports; primary documents not yet reviewed for LT residential consumers.

Official TNPDCL (formerly TANGEDCO/TNEB) Portal ↗
Consumption Tier (kWh) Base Energy Rate Billing Basis Subsidy Status
0 – 100 Units (100% Free Govt Subsidy) ₹0.00 / unit Telescopic Tier 100% Free Subsidy
101 – 200 Units (Free if total ≤500u; ₹2.35 if >500u) ₹2.35 / unit Telescopic Tier Standard Rate
201 – 400 Units ₹4.70 / unit Telescopic Tier Standard Rate
401 – 500 Units ₹6.30 / unit Telescopic Tier Standard Rate
501 – 600 Units ₹8.40 / unit Telescopic Tier Standard Rate
601 – 800 Units ₹9.45 / unit Telescopic Tier Standard Rate
801 – 1000 Units ₹10.50 / unit Telescopic Tier Standard Rate
Above 1000 Units ₹11.55 / unit Telescopic Tier Standard Rate
* Summary: ≤500u: 0–200 units Free (₹0.00) | >500u: 0–100 units Free, 101–200 units: ₹2.35 | 201–400 units: ₹4.70 | 401–500 units: ₹6.30 | 501–600 units: ₹8.40 | 601–800 units: ₹9.45 | 801–1000 units: ₹10.50 | 1000+ units: ₹11.55. Source: G.O. (Ms) No. 50 dated 10 May 2026 / TNERC Order No. 5 of 2026 (date not yet confirmed), per published reports; primary documents not yet reviewed

How is Electricity Bill Calculated in Tamil Nadu?

Electricity bills under TNEB (TNPDCL / TNPDCL) in Tamil Nadu are calculated on a bi-monthly (60-day) billing cycle using progressive telescopic tariff slabs governed by TNERC regulations. Under the Government of Tamil Nadu order effective 10 May 2026 (G.O. (Ms) No. 50 dated 10 May 2026 and TNERC Order No. 5 of 2026 (date not yet confirmed), per published reports; primary documents not yet reviewed; supported by provisional TNERC subsidy approval of ₹1,545.14 crore for FY 2026–27), all domestic households (LT Tariff 1A) whose total bi-monthly consumption is up to 500 units receive 200 units completely free of charge. For consumption exceeding 200 units within this band, remaining energy is billed across intermediate slabs (201–400 units at ₹4.70/unit and 401–500 units at ₹6.30/unit). If a household's total consumption exceeds 500 units in a 60-day billing cycle, the subsidy reverts to the baseline 100 free units, and units from 101 to 200 are charged at ₹2.35/unit, followed by the full progressive tariff slabs up to ₹11.55/unit. Low-tension residential consumers remain fully exempt from fixed demand charges and state electricity duty under current state subsidy allocations.

How to Calculate Your TNPDCL (formerly TANGEDCO/TNEB) Electricity Bill

1

Record 60-Day Meter Units

Subtract previous meter reading from current reading to determine total bi-monthly kWh consumption.

2

Evaluate 500-Unit Threshold

If total bi-monthly usage is ≤500 units, apply 200 free units. If usage exceeds 500 units, apply 100 free units.

3

Distribute into Active Slabs

Allocate units above the free threshold into progressive telescopic slabs (201–400 @ ₹4.70, 401–500 @ ₹6.30, etc.).

4

Calculate Net Payable

Sum energy charges across active slabs. Fixed demand charges and electricity duty remain ₹0 for LT-1A domestic.

Step-by-Step Bill Calculation Example (300 Units)

Detailed sample bill calculation for a domestic residential meter during a Bi-Monthly (60 Days) cycle.

Slab 1 (0 – 200 units) 200 units @ ₹0.00 (200 Free Units Subsidy - May 2026 Scheme, per published reports; primary documents not yet reviewed)
₹0.00
Slab 2 (201 – 300 units) 100 units @ ₹4.70/unit (Provisional Rate)
₹470.00
Fixed Demand Charges Exempt for LT-1A Domestic
₹0.00
Electricity Duty (0%) Subsidized by TN State Government
₹0.00
Net Estimated Payable: ₹470.00

Final bill is rounded to the nearest rupee for display. Line items may not sum exactly due to rounding.

Tamil Nadu TNEB Multi-Tier Bi-Monthly Calculation Matrix (2026 Scheme)

Exact mathematical itemization for standard residential household consumption levels across 60-day billing cycles, comparing the 200 free units scheme (≤500u) and baseline 100 free units (>500u).

Bi-Monthly Units Daily Average Slab Itemization & Math Net Payable
100 Units ~1.6 units/day 100 units @ ₹0.00 (100% Free Govt Subsidy) ₹0.00
200 Units ~3.3 units/day 200 units @ ₹0.00 (100% Free under May 2026 Scheme — saves ₹235) ₹0.00
300 Units ~5.0 units/day (200 × ₹0.00) + (100 × ₹4.70 = ₹470) ₹470.00
350 Units ~5.8 units/day (200 × ₹0.00) + (150 × ₹4.70 = ₹705) ₹705.00
500 Units ~8.3 units/day (200 × ₹0) + (200 × ₹4.70 = ₹940) + (100 × ₹6.30 = ₹630) ₹1,570.00
501 Units (Cliff Edge!) ~8.4 units/day Crosses 500u: forfeits extra 100 free units. (100 × ₹0) + ₹235 + ₹940 + ₹630 + (1 × ₹8.40) ₹1,813.40
600 Units ~10.0 units/day (100 × ₹0) + ₹235 + ₹940 + ₹630 + (100 × ₹8.40 = ₹840) ₹2,645.00
800 Units ~13.3 units/day ₹2,645 + (200 × ₹9.45 = ₹1,890) ₹4,535.00

What Changed in May 2026? (100 vs. 200 Free Units Scheme Explained)

Prior to 10 May 2026, Tamil Nadu domestic electricity consumers received a flat allowance of 100 free units per 60-day billing cycle under state government subsidy policy. Effective 10 May 2026, the Government of Tamil Nadu enacted an expanded subsidy allocating 200 free units to domestic households consuming up to 500 units bi-monthly, backed by a provisional TNERC subsidy approval of ₹1,545.14 crore for FY2026–27.

Crucially, this is a threshold-dependent scheme rather than an unconditional grant. If your meter reading exceeds 500 units, the subsidy reverts to the original 100 free units. This creates a noticeable cliff-edge: consuming 500 units results in a bill of ₹1,570.00, whereas consuming 501 units triggers a bill of ₹1,813.40 (+₹243.40 for just 1 extra unit). For an exhaustive side-by-side breakdown and historical tariff comparisons, read our detailed guide: TNEB Old vs New Tariff 2026 Guide →.

Understanding the Tamil Nadu Bi-Monthly Billing Cycle

In Tamil Nadu, TNPDCL assesses domestic electricity on a 60-day cycle. This means domestic consumers receive their utility bill 6 times per year rather than 12. Because consumption spans 60 days, power consumed by daily household appliances (refrigerators, ceiling fans, lighting, and seasonal air conditioners) accumulates over two full calendar months.

Under the progressive telescopic structure, your total consumption is divided across tier brackets. For households using up to 500 units, the first 200 units are fully waived, and units between 201 and 500 are charged at ₹4.70 to ₹6.30. When bi-monthly consumption crosses 500 units, only the first 100 units remain free, and units from 101 to 200 are charged at ₹2.35, followed by higher tiers up to ₹11.55/unit. Keeping household bi-monthly consumption at or below 500 units ensures you capture the maximum ₹235 subsidy waiver.

All domestic consumers in Tamil Nadu are advised to verify their Aadhaar linking status through the official TNPDCL portal to ensure uninterrupted disbursement of the state government electricity subsidy.

Domestic LT-1A vs. Commercial LT Tariff V Classification

Under the Tamil Nadu Electricity Regulatory Commission (TNERC) distribution regulations, Tariff LT-1A is strictly reserved for residential premises, domestic lighting, household appliances, and common lighting in multistory apartment buildings. Operating commercial activities, private tuition centers with dedicated staff, shops, clinics, or rented guest houses requires classification under Tariff LT-V (Commercial / Non-Domestic). Unauthorized commercial load usage on domestic meters attracts penal assessments under Section 126 of the Electricity Act 2003. Commercial connections do not qualify for free units.

Digital Meter Verification & Supply Code Rules

When TNPDCL meter assessors record bi-monthly readings, consumers can verify accuracy on their static digital meter display. The standard display scrolls automatically through Date, Time, Cumulative Active Energy (kWh), Maximum Demand (kW), and Voltage. Ensure your bill reflects the Cumulative Active Energy (kWh) reading and not apparent energy (kVAh). Under Section 11 of the Tamil Nadu Electricity Supply Code, if a domestic meter is found defective or stuck, billing for the intervening period is computed on the basis of the average consumption of the preceding three bi-monthly billing cycles where the meter was functioning correctly.

TNERC Rooftop Solar & Net Feed-in Mechanism

Domestic consumers in Tamil Nadu who install grid-interactive rooftop solar PV systems operate under the TNERC Rooftop Solar PV Order. Under the Net Feed-in mechanism, solar energy generated is first consumed on-site to offset daytime appliance loads. Unconsumed excess generation exported to the TNPDCL grid is credited at the TNERC-approved feed-in tariff rate (typically 75% to 80% of the pooled cost of power purchase) and adjusted against the consumer's total bi-monthly electricity bill, significantly reducing net payable costs. Solar consumers retaining domestic meters still receive their eligible free unit allocation.

Payment Schedules, Disconnection Notice & Due Dates

TNPDCL provides a statutory grace period of 15 to 20 days from the date of bill issuance for payment without surcharge. Payments can be completed online via TNPDCL Quick Pay, Bharat Bill Payment System (BBPS), UPI apps, or section collection counters. Failure to remit payment before the due date incurs a monthly late payment surcharge (BPSC) of 1.5% per month. Unpaid accounts receive a statutory 15-day disconnection notice under Section 56(1) of the Electricity Act 2003 before physical power disconnection at the pole or distribution box.

TNPDCL (formerly TANGEDCO/TNEB) Fixed Demand Charges by Sanctioned Meter Load (1 kW to 5 kW)

Monthly capacity charges assessed based on your contracted meter capacity.

Sanctioned Load Fixed Charge Rate Monthly Fixed Cost Typical Household Type
1 kW Connection ₹0/kW/mo ₹0.00/mo 1 BHK / Basic Lighting
2 kW Connection ₹0/kW/mo ₹0.00/mo 2-3 BHK (1 AC + Refrigerator)
3 kW Connection ₹0/kW/mo ₹0.00/mo 3 BHK (2 ACs + Geyser)
4 kW Connection ₹0/kW/mo ₹0.00/mo 4+ BHK / Heavy Appliances
5 kW Connection ₹0/kW/mo ₹0.00/mo 4+ BHK / Heavy Appliances

Frequently Asked Questions (TNPDCL (formerly TANGEDCO/TNEB) Bill Calculation)

Common queries answered regarding Tamil Nadu electricity tariffs, slabs, and billing rules.

How is the TNEB electricity bill calculated for 350 units under the new scheme? ▼

For a bi-monthly consumption of 350 units (which is ≤500 units), the new 200 free units scheme applies: 0–200 units are free (₹0.00), and the remaining 150 units (201–350) are billed at ₹4.70/unit = ₹705.00. Fixed charges and electricity duty are ₹0.00, making the total payable bill exactly ₹705.00 (saving ₹235 compared to the old scheme).

How is the TNEB electricity bill calculated for 500 units? ▼

For exactly 500 units bi-monthly: Slab 1 (0–200 units) is free (₹0.00), Slab 2 (201–400 units) is 200 × ₹4.70 = ₹940.00, and Slab 3 (401–500 units) is 100 × ₹6.30 = ₹630.00. Total payable bill is ₹1,570.00 with zero fixed charges.

What happens to my TNEB bill if I consume more than 500 units (e.g. 600 units)? ▼

When consumption crosses 500 units, the consumer forfeits the expanded subsidy and receives only the baseline 100 free units. For 600 units: 0–100 units = ₹0.00; 101–200 units = ₹235.00 (100 × ₹2.35); 201–400 units = ₹940.00 (200 × ₹4.70); 401–500 units = ₹630.00 (100 × ₹6.30); and 501–600 units = ₹840.00 (100 × ₹8.40). Total bill is ₹2,645.00.

Are 200 units free in Tamil Nadu for everyone? ▼

No. The 200 free units scheme (effective 10 May 2026, per published reports; primary documents not yet reviewed; G.O. (Ms) No. 50 dated 10 May 2026 / TNERC Order No. 5 of 2026 (date not yet confirmed)) is exclusively available to domestic LT-1A consumers whose total bi-monthly consumption does not exceed 500 units. If your bi-monthly meter reading exceeds 500 units, you receive only 100 free units. Commercial and industrial connections are not eligible.

Has TNERC formally published gazetted slab rates for 201–500 units under the new scheme? ▼

The 200 free units scheme was enacted via the Tamil Nadu Government Order dated 10 May 2026 (G.O. (Ms) No. 50 dated 10 May 2026 / TNERC Order No. 5 of 2026 (date not yet confirmed), per published reports; primary documents not yet reviewed) with provisional subsidy allocations approved by TNERC. However, a separate, gazetted revision of intermediate slab rates has not yet been formally issued. Rates shown for 201–500 units remain provisional/estimated based on prevailing tariff schedules.

Why does TNEB calculate bills on a bi-monthly basis? ▼

TNPDCL assesses domestic meter readings once every 60 days (6 times per year). Tariff slab limits (e.g., 200 free units, 500-unit ceiling) are scaled for two full months of usage so that households receive their full bi-monthly subsidy allocation.

Is Aadhaar linking mandatory to receive the TNEB electricity subsidy? ▼

Yes. The Government of Tamil Nadu mandates linking consumer service numbers with Aadhaar on the official TNPDCL portal to verify domestic occupancy and disburse the electricity subsidy.

Is this calculator officially affiliated with TNPDCL or the Tamil Nadu Government? ▼

No. ElectricityBillCalc.com is an independent utility informational resource. This calculator provides estimates modeled on published tariff schedules and government notifications, but is not affiliated with TNPDCL or TNPDCL. Always verify against your official utility bill.

Explore Other State Electricity Boards

ℹ️
Tariff Estimation Notice:

All calculations and reports on ElectricityBillcalc.com are estimated models computed according to published State Electricity Regulatory Commission (SERC) tariff schedules for FY 2026-27. Actual utility bills may include municipal taxes, meter rent, arrears, or power factor adjustments. Please verify against your official electricity board invoice.